No road maintenance performed during the time period 10/03/23 to present. Road maintenance is scheduled for mid March as we approach spring. The dips in the road at the site of the new culverts will be addressed at that time. These dips are normal and a result of ground settling over the repair area. Gravel and grading over this area will bring it back to standard and may have to be repeated in another year.
All ditches and culverts are evacuating water as expected. Dry conditions result in rougher washboarding on the roads that will subside with significant rainfall and maintenance on these areas will correct these issues.
A note to property owners, please encourage use of AWD or 4WD vehicles on our roads. We have been experiencing repeated damage to the concrete strip area from front wheel drive only vehicles. If you have traction control on your vehicle disengage it while traveling our roads or you may find yourself stuck without power on our steeper inclines. Remember that roads have less traction when dry and more when wet. Swing wide in all turns which give you better traction and line of sight to oncoming traffic. Please keep your driveway culvert heads clear of debris. Slow down when approaching homes and people walking on the road, your neighbors will appreciate it.
This road report is respectfully submitted by:
Frank Stroman PMPOA Road Commissioner
Pinnacle Parkway Agreement 04-2024 - 06-2024 (pdf)
Download2021-2023 Agreement Lawsuit Arbitration Award and Judgement (PDF)
DownloadPinnacle Parkway Agreement 2021-2023 (pdf)
DownloadPinnacle Parkway Agreement 2020-2021 (pdf)
DownloadPinnacle Parkway Agreement 2019-2020 (pdf)
DownloadPinnacle Parkway Agreement 2018-2019 (pdf)
DownloadPMPOA
Copyright © 2025 PMPOA - All Rights Reserved.
Powered by GoDaddy Website Builder
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.